| 2 December, 2000 |
|

Click on the image to see it full size (77K).
Insulation is being installed by the insulation subcontractor (31W Insulation, Katy, TX) in the attic and into
all of the walls, as can be seen in this view of the office area.
We are even putting light insulation (R-11) into the interior walls and between the floors for sound
suppression.
We are scheduled to begin installing sheet rock and other wall materials on Monday, 4 December.
|
| 6 December, 2000 |
|

Click on the image to see it full size (50K).
The drywall subcontractor (Zeisert Drywall, Houston, TX) has been busy!
Here we can see one of the guest bedrooms, where the sheet rock has been completed.
In fact, sheet rock has been hung in all rooms (where it is intended), along with all ceilings throughout the
house.
The next step for those surfaces is the taping and floating.

Click on the image to see it full size (52K).
Green board has been installed in water areas, such as the shower in the master bath.
This large (5' x 6') walk-in shower is the subject of a lot of interest!
In this photo, you can see some of the outlets.
On either side there is a hand held shower head, and three adjustable body spray outlets.
The left side has a fixed shower head above the seat.
A large overhead rain maker shower head is for those times when we want to be completely drenched!

Click on the image to see it full size (83K).
Here we get our first look at the beginnings of the screened-in back porch.
An opening for a screen door seems to be missing on the short right wall.
|
| 9 December, 2000 |
|

Click on the image to see it full size (84K).
What about the walls that are not sheet rock?
This is a view of the living room taken while standing on the stairs, showing that these walls are made of wood
planking, installed by Ceasar Gatica's Trim (Houston, TX).
They will be left in this natural color, with a light sealant.

Click on the image to see it full size (70K).
Downstairs, this wood planking will be used in the master bedroom in addition to the living room, dining room,
and entry.

Click on the image to see it full size (72K).
Upstairs, the wood planking will also be used in the office and studio.
|
| 17 December, 2000 |
|

Click on the image to see it full size (52K).
The interior doors are hung and are being trimmed by Ceasar Gatica's Trim (Houston, TX).
The doors are made from knotty pine with tongue and groove panels.

Click on the image to see it full size (37K).
More trim work is evident around the windows, as can be seen in this view of one of the guest bedrooms.

Click on the image to see it full size (108K).
The big news is that the septic system is in the ground, installed by Braden Septic Services (Hempstead, TX)!
Looking back to the house, we can see that the sewer lines are installed, and ready to be connected.
|
| 23 December, 2000 |
|

Click on the image to see it full size (70K).
More trim work is evident as bookshelves are being completed in the library.
I supposed this means we will actually have to get some books now.

Click on the image to see it full size (67K).
In the office area, the beginnings of my work desk appear, making me eager to get to work.
What am I saying?!?
Well, at least it will be a relatively pleasant experience to work there.
|
| 30 December, 2000 |
|

Click on the image to see it full size (53K).
More rough cabinet work has been done.
Here we see the upper cabinets in the laundry over the washer and dryer connections.
|