This is the list of significant events in the construction of the Double Luck Farm House during February, 2001.

3 February, 2001

More kitchen cabinets
Click on the image to see it full size (76K).

Cabinet construction continues. Here we see the inside wall of the kitchen, containing a builtin desk, pantry, refrigerator, microwave, and coffee center.

7 February, 2001

Exterior painting
Click on the image to see it full size (74K).

The painters are working on the outside surfaces. On this dormer, the final colors have been applied to the walls and the trim boards. Later, shutters will be added to the window and painted a third color for contrast.

Builtin bed in dormer
Click on the image to see it full size (63K).

Inside the dormers in each of the upstairs bedrooms will be a builtin twin size bed. Here we can see that the bed frame is under construction.

More kitchen cabinets
Click on the image to see it full size (58K).

Meanwhile, cabinet construction continues in the kitchen and other locations. Here we see that the builtin desk and pantry are almost complete.

21 February, 2001

Floor in living room
Click on the image to see it full size (102K).

The flooring subcontractor (Floors and More, Houston, TX) has begun the installation of the Brazilian Cherry floors. Downstairs, this flooring will be used in the entry, living room, dining room, and kitchen. Upstairs, it will also be used in the office, studio, and library, as well as for the steps and risers on the staircase.

Entertainment center
Click on the image to see it full size (70K).

In the Master Bedroom, an entertainment center has been constructed, and is almost ready to hold the television and other electronic equipment.

Completed builtin bed in dormer
Click on the image to see it full size (61K).

The dormer beds in the upstairs bedrooms have been completed. All we need now is a mattress and a pillow for each of them!

Bypass Construction History August, 2000 September, 2000 October, 2000 November, 2000 December, 2000 January, 2001 February, 2001 March, 2001 April, 2001 May, 2001 June, 2001 July, 2001
Friendly Farm House Construction Submenu
Web Site Menu Contact webmaster Prior page Next page
URL: http://www.doubleluck.com/places/house/construction/const0102.php
Last modified: Wed, 27 May 2009 13:22:57 -0600
Copyright © 1999-2010 Larry Bristol - All rights reserved.