Click on the image to see it full size (76K).
Cabinet construction continues.
Here we see the inside wall of the kitchen, containing a builtin desk, pantry, refrigerator, microwave, and
coffee center.
|
|

Click on the image to see it full size (74K).
The painters are working on the outside surfaces.
On this dormer, the final colors have been applied to the walls and the trim boards.
Later, shutters will be added to the window and painted a third color for contrast.

Click on the image to see it full size (63K).
Inside the dormers in each of the upstairs bedrooms will be a builtin twin size bed.
Here we can see that the bed frame is under construction.

Click on the image to see it full size (58K).
Meanwhile, cabinet construction continues in the kitchen and other locations.
Here we see that the builtin desk and pantry are almost complete.
|
|

Click on the image to see it full size (102K).
The flooring subcontractor (Floors and More, Houston, TX) has begun the installation of the Brazilian Cherry
floors.
Downstairs, this flooring will be used in the entry, living room, dining room, and kitchen.
Upstairs, it will also be used in the office, studio, and library, as well as for the steps and risers on the
staircase.

Click on the image to see it full size (70K).
In the Master Bedroom, an entertainment center has been constructed, and is almost ready to hold the television
and other electronic equipment.

Click on the image to see it full size (61K).
The dormer beds in the upstairs bedrooms have been completed.
All we need now is a mattress and a pillow for each of them!
|