These are the significant events in the construction of the Double Luck Station during March 2001.

4 March, 2001

A bird takes up residence
Click on the image to see it full size (76K).

Before we can move ourselves in, a bird has taken up residence in one of the cabinets. This is not fair!

7 March, 2001

Wall texture
Click on the image to see it full size (48K).

The painters have been busy applying texture to the (drywall) walls and ceilings in preparation for the first coat of paint.

11 March, 2001

Cabinet doors and drawer fronts installed
Click on the image to see it full size (68K).

The cabinet doors and drawer fronts have been installed.

17 March, 2001

Interior walls complete
Click on the image to see it full size (82K).

The car siding walls have been sealed with polyurethane.

Exterior painting complete
Click on the image to see it full size (183K).

The exterior painting is also complete, except for the window shutters, to be added a little later.

Bypass Construction History August, 2000 September, 2000 October, 2000 November, 2000 December, 2000 January, 2001 February, 2001 March, 2001 April, 2001 May, 2001 June, 2001 July, 2001
Friendly Station Construction Submenu
Web Site Menu Contact webmaster Prior page Next page
URL: http://www.doubleluck.com/places/station/construction/const0103.php
Last modified: Wed, 27 May 2009 13:22:57 -0600
Copyright © 1999-2010 Larry Bristol - All rights reserved.